From 01-07-2009 the producers of concrete with industrialized process, must guarantee a qualitatively suitable production and adequate equipment, together with suitable personnel. 

Specifically, the DM 14-01-2008 prescribes the drafting of a production system control manual, the so-called FPC (Factory Production Control) and the consequent evaluation by a third party, independent and authorized by the higher council LL.PP.

Certy Ceq srl is an authorized body.